09 February 2019

Saturday saw us testing the capacitance belts but although they were showing characteristic changes between submerged and not, the readings are still giving us a few questions to be answered!


The umbilical behind the Nav Radar seat was finished in the morning and quite a bit of the day was spent sorting out the storage..
One of the covers for the spare fuse storage panel in the cockpit was replaced due to a missing fastener and later in the day the aircraft was exercised with a systems demo of lighting, control surfaces, airbrakes and bomb doors and everything ran smoothly.
The wheel bays were also measured ready for us to fabricate some protective netting to prevent any “wild” (not volunteer!!) visitors
Pictures are from Helen, Matt, Isi and James