A very busy day on Saturday with work continuing on fault finding with the wiring loom in the number 4 engine bay, lots of visitors and our equipment runs as it was the first weekend of the month. All equipment was run successfully with the exception of the Houchin which is receiving attention to the circuit breakers.
We also had chance to look at a way of providing cool air to the cockpit given the temperatures we have been experiencing lately! This involved an air con unit being installed in the cockpit, around the bomb aimers position with a hose running into and to a vent in the nose radome.
Work also continued on the number 4 engine itself, prepping for the removal of the CMFS.
Our painting team were also very busy on the port side and wing of the aircraft.